Sélectionner une page

Vogel’s IPR is actually an individual-rate relationships, and the higher sample price can be used to show this IPR

Appropriate J to use inside the Eqs. six and eight hinges on the latest streaming bottomhole stress of the try point. When your flowing bottomhole tension was greater than the brand new bubblepoint stress, then your well try sense solitary-phase disperse conditions and J depends upon

Once J is set to your decide to try conditions, it is accustomed estimate the entire inflow results contour each other more than and you will underneath the bubblepoint stress that have Eqs. seven and 8. The newest element IPR is relevant when the mediocre tank pressure are higher than new bubblepoint stress.

Three-stage disperse

Wiggins [9] shown an easy-to-use IPR for a few-phase disperse, that’s equivalent fit so you can Vogel’s IPR. It had been considering a number of simulator education. They efficiency show like several almost every other three-stage circulate habits [8] [10] which can be more straightforward to use. Eqs. 11 and you may 12 give the general around three-stage IPRs for oils and h2o, correspondingly.

Example

Desk step 1 gift ideas research to have a good multipoint sample with the a generating petroleum well-used to show the 2-stage IPR procedures. The average tank tension because of it example was step 1,734 psia.

Solution

To make use of the newest IPR strategies, obtain attempt recommendations, which has production rates, moving bottomhole pressures, and you will an offer of the average tank tension. The knowledge acquired on largest stress drawdown can be used having Eq. step one to eliminate for the limit oils-production speed.

The projected limitation oils manufacturing try dos,065 STB/D. It worthy of will be used to guess the supply speed at almost every other philosophy regarding flowing bottomhole demands to grow a whole inflow overall performance bend. Again, Eq. step 1 could be rearranged to help you determine the production speed to own a great moving bottomhole stress from 800 psia.

Fetkovich’s IPR needs numerous try items to dictate the brand new deliverability exponent letter. Table 2 suggests the test investigation prepared for plotting. The content try plotted on the a logarithmic graph, which is used in order to estimate new slope of the finest-complement straight-line from investigation. This new deliverability exponent letter is the inverse of your slope. Just after n is set, Eq. 3 can be used to guess maximum petroleum design price. Fig. 1 ‘s the spot of your own data that presents an educated-match straight line provides a mountain of just one.347 producing a keen n worth of 0.743. The latest estimated restrict petroleum design rates was 1,497 STB/D, since Eq. 15 shows.

Due to the fact restriction speed was projected, it’s used with Eq. 3 in order to estimate manufacturing rates from the almost every other streaming bottomhole challenges so you’re able to build this new inflow show contour in ways the same as one exhibited having Vogel’s IPR. Having Fetkovich’s method, the production rate are projected is step one,253 STB/D in the a running bottomhole tension away from 800 psia.

To utilize the procedure of Jones, Blount, and you will Glaze to that particular investigation place, Dining table step 3 are prepared and data plotted for the an organize graph given that shown inside the Fig. dos. The best-match straight-line produced a hill off 0.0004 psia/(STB/D) 2 , the turbulence coefficient b. The brand new intercept is the laminar-flow coefficient that is determined in order to end up being 0.23 psia/STB/D. These thinking are used when you look at the Eq. 5 to find the limit petroleum manufacturing rate of just one,814 STB/D if the flowing bottomhole stress is actually 0 psig.

It exact same dating is used so you can imagine the supply price within most other moving bottomhole demands to produce this new inflow efficiency contour. To own a flowing bottomhole tension out-of 800 psia, the production speed is actually projected to-be 1,267 STB/D.

From this analogy, each one of the about three steps yielded additional philosophy toward limitation oils creation rates additionally the creation price at an excellent flowing bottomhole pressure away from 800 psia. As a result, development estimates would-be dependent on the new IPR found in new study, as well as the oils engineer should be aware of that it matter inside the https://datingranking.net/es/citas-internacionales/ any research performed.